History of the Tacoma Narrows Bridge
The storm cable assembly and catwalks are
shown during the construction of the Tacoma Narrows Bridge, January 10,
1940. PH Coll. 11.19 University of Washington Libraries. Manuscripts,
Special Collections, University Archives Division.
|
Pt. 2: Construction
1938-1940
The following images and text detail the construction of Tacoma Narrows
Bridge. Links to further pages on the Introduction, Opening, Collapse,
Aftermath, and Reconstruction are available at the bottom of the page.
Text sources are listed in the bibliography at the end of the Reconstruction
section. Image sources are described in the captions accompanying
the images. The images are the exclusive right of the cited institutions
(the University of Washington Libraries Special
Collections Division and the Museum
of History and Industry), please contact them for reproduction
permission.
For additional images and documents relating to the history of the Tacoma Narrows Bridge, see the Tacoma Narrows Bridge Collection on the UW Libraries Digital Collections website.
[Enlarge image] | [Enlarge mileage chart] Tacoma area road map shows the necessity for
a bridge spanning the Narrows, the distance from Tacoma to Gig Harbor is
shortened by 102 miles. PH Coll. 290 LTN 1 University of Washington Libraries.
Special Collections Division.
|
The people of western Washington had discussed the advantages
of constructing a bridge across the Narrows for many years. In the first
half of the 20th century the Olympic Peninsula was largely undeveloped.
Tapping its resources through the construction of a bridge became an increasingly
popular proposal to those who saw the potential economic value. In 1923
the Federation of Improvement Club Committee in Tacoma started a feasiblity
investigation of the project. Another investigation in 1927 by the Tacoma
Chamber of Commerce Roads and Bridges Committee confirmed the viability
and formed a fundraising committee for a preliminary survey.
[Enlarge image] Artist's rendering of the proposed Tacoma Narrows
Bridge and tollbooths. PH Coll. 11.4 University of Washington Libraries.
Special Collections Division.
|
A public announcement of a favorable projection came in 1928.
Evans, Hickey, and Lewis were granted the franchise. They signed a trust
agreement with the Tacoma Chamber of Commerce giving them control of
the franchise rights. Attempts at federal funding for the bridge project
were unsuccessful over the next five years.
[Enlarge image] Concrete is poured to create the caisson anchor
blocks for the Tacoma Narrows Bridge. PH Coll. 290 LTN 6 University of
Washington Libraries. Special Collections
Division.
|
In January 1937 the Washington State Legislature passed an
act creating a State Toll Bridge Authority. The bridge project was then
transferred to this Authority under the direction of State Highway Director
L.V. Murrow. The Authority applied for a grant from the Public Works Administration
(PWA) and a loan from the Reconstruction Finance Corporation (RFC) in June
1938 but construction bids exceeded the total $6,000,000 amount requested
and compelled the Authority to apply again. On September 30, 1938 the
Federal Government announced a $2,880,000 PWA grant and a $3,520,000 RFC
loan (to be repaid through tolls) were accepted by the Washington State
Toll Bridge Authority to construct the Tacoma Narrows Bridge.
[Enlarge image] Concrete pours from a clamshell bucket into
the caisson during the construction of the Tacoma Narrows Bridge. Seattle
Post-Intelligencer Collection, PI- 20768. Courtesy of the Museum of History
and Industry, Seattle.
|
The Bridge Engineering Division of the Washington State Department
of Highways developed plans during the summer of 1938 with the consultation
of Leon S. Moisseif and Moran and Proctor, engineers based in New York.
On September 27, 1938, a contract for the construction of the bridge was
awarded to the Pacific Bridge Company of San Francisco, the General Construction
Company of Seattle, and the Columbia Construction Company of Bonneville,
Oregon who combined into an operating firm entitled the Pacific-General-Columbia
Company. Designated the operating company, the Pacific Bridge Company
began superstructure work on November 23, 1938.
[Enlarge image] Drawings of the caisson and foundation
of the Tacoma Narrows Bridge. PH Coll. 11.7 University of Washington Libraries.
Special Collections Division.
|
The design of the bridge called for two main piers, towers
and cables as well as anchorages, and a concrete floor system. Construction
began on the piers as soon as the contract was awarded in order to have
the foundations and piers in place before June, when the Tacoma Narrows
typically experienced extreme tides.
A false bottom caisson (a watertight chamber used in construction
work under water) was used in the pier and foundation construction. To
stabilize the caisson anchor blocks of 600-ton concrete were made on shore,
pulled to site by barge and then tipped into the Narrows. Cables attached
to the concrete blocks anchored the floating caisson.
Slideshow
|
[Show image] After being built in Seattle, the caisson used
during construction passes under the Fremont Bridge as it is towed to the
Tacoma Narrows, April 1, 1939. Seattle Post-Intelligencer Collection, PI-
20760. Courtesy of the Museum of History and Industry, Seattle.
|
|
[Show image] The caisson nears the construction site where
it will be used to help build the piers of the Tacoma Narrows Bridge. PH
Coll. 290 LTN 25 University of Washington Libraries. Manuscripts, Special
Collections, University Archives Division.
|
|
[Show image] A caisson anchor block for the Tacoma Narrows
Bridge rests on a barge before placement. PH Coll. 290 LTN 7 University
of Washington Libraries. Special Collections
Division.
|
|
[Show image] The caisson anchor slides off the bardge and splashes into the water during Tacoma Narrows Bridge construction. PH Coll. 290 LTN 13 University of Washington Libraries. Manuscripts, Special Collections, Archives Division.
|
|
[Show image] The barge rises out of the water as the caisson
anchor is dumped into the Tacoma Narrows. PH Coll. 290 LTN 12 University
of Washington Libraries. Special Collections
Division.
|
[Enlarge image] The caisson surrounds the beginning
work on the Tacoma Narrows Bridge tower. PH Coll. 581.2 University of Washington
Libraries. Special Collections Division.
|
As the steel framework and concrete were added, the caisson
gradually sank. When it landed on the Narrows floor, the false bottoms
were removed and the cutting edges, plus the weight of the caisson, forced
it down as clamshells excavated through the hollow cells. Special labor
agreements made it possible for work to go forward twenty-four hours a
day and seven days a week so that the pier and foundation building phase
was completed in September 1939.
 |
 |
|
[Enlarge image] Drawing of the Tacoma Narrows Bridge
anchorages, ca. 1939. PH Coll. 11.8 University of Washington Libraries.
Special Collections Division.
|
[Enlarge image] Construction on one of the anchorages for the
Tacoma Narrows Bridge begins during the summer of 1939. PH Coll. 290 LTN
51 University of Washington Libraries. Manuscripts, Special Collections,
University Archives Division.
|
The bridge anchorages were also constructed in the early part
of the project. They were finished by the end of the summer in 1939. Made
up of large concrete blocks set in sand and gravel of the Narrows banks,
the anchorages each weighed about 44,000 tons and were created to resist
the cable pulls of the bridge.
South splay casting on the east anchorage of
the Tacoma Narrows Bridge, March 5, 1940. PH Coll. 11.27 University of Washington
Libraries. Special Collections Division.
|
The south cable is complete at
the west anchorage of the Tacoma Narrows Bridge, March 5, 1940. PH Coll.
11.28 University of Washington Libraries. Manuscripts, Special Collections,
University Archives Division.
|
[Enlarge image] Workmen pour the fender slab on pier 5 of the
Tacoma Narrows Bridge, September 7, 1939. Simmer 323. PH Coll. 290.3 University
of Washington Libraries. Special Collections
Division.
|
Construction on the towers began early in July 1939 and
continued until early November. The towers were constructed with the help
of a traveler derrick (a machine for hoisting and moving heavy objects,
consisting of a movable boom equipped with cables and pulleys and connected
to the base of an upright stationary beam) that moved upward as the towers
were built. After the towers were erected they were fitted with approximately
104,000 field rivets. Finally, the towers were sand blasted and painted.
Slideshow
[Show image] The derrick moves upward as the Tacoma Narrows
Bridge tower continues to grow, August 10, 1939. Tower No. 4 Simmer 250.
PH Coll. 11.12 University of Washington Libraries. Manuscripts, Special
Collections, University Archives Division.
[Show image] Construction continues on a tower for the
Tacoma Narrows Bridge. PH Coll. 290.7 University of Washington Libraries.
Special Collections Division.
[Show image] The completed pier and tower 4 stand in the
distance as work begins on pier 5 of the Tacoma Narrows Bridge, September
7, 1939. Simmer 319. PH Coll. 290.2 University of Washington Libraries.
Special Collections Division.
|
[Enlarge image] Construction on the cables and catwalk of
the Tacoma Narrows Bridge is viewed from the shore. PH Coll. 581.3 University
of Washington Libraries. Manuscripts, Special Collections, University
Archives Division.
|
The two main cables were 17 1/4" in diameter made up
of 6,308 wires with a breaking strength of 220,000 lb. per sq. inch (the
estimated design load was stress of 83,000 lb. per sq. inch.) The wires
were precut to the correct length. They were unreeled on site, placed
on the ground and in the water from anchorage to anchorage, then raised
one at a time to the tower top and adjusted into their final positions.
[Enlarge image] Tacoma Narrows Bridge first spinning of the
wire, January 10, 1940. Pictured are Everett T. Smith, President of the
Chamber of Commerce; John Schlarb, Chairman of the Board of County Commissioners;
Mayor J.J. Kaufman; Mrs. Doc Weathers; Lacey V. Murrow, State Highway Director;
Admiral Luther E. Gregory, State Liquor Board Head; Charles E. Andrew, Principal
Consulting Engineer; and Cliff Yelle, State Auditor. PH Coll. 11.23 University
of Washington Libraries. Special Collections
Division.
|
Once the spinning was complete the strands were compacted
and welded cable bands were placed around them. Wrapping the cables with
galvanized wire laid in a thick paste of red lead and then painting them
to match the towers were the final steps in the cables construction.
| [Show image] Spools of wire are wound during the Tacoma
Narrows Bridge cable spinning process. Seattle Post-Intelligencer Collection,
PI- 20784. Courtesy of the Museum of History and Industry, Seattle.
|
Slideshow
|
| [Show image] Workmen with a reel of wire during the spinning
of the Tacoma Narrows Bridge suspension cable. Seattle Post-Intelligencer
Collection, PI- 20785. Courtesy of the Museum of History and Industry, Seattle.
|
| [Show image] Cable Stringing machinery can be seen from
a Tacoma Narrows Bridge tower, December 2, 1939. Seattle Post-Intelligencer
Collection, PI- 20776. Courtesy of the Museum of History and Industry,
Seattle.
|
| [Show image] From shore to tower, men walk the catwalks
during Tacoma Narrows Bridge construction, January 3, 1940. Seattle Post-Intelligencer
Collection, PI- 20780. Courtesy of the Museum of History and Industry, Seattle.
|
The floor system was made up of two stiffening side girders
and a frame of floor beams and stringers that supported the concrete roadway.
Individual girders, floor beams and stringers were assembled on barges.
Positioning the pieces under the bridge they were then lifted into place
by traveler derricks attached to the main cables. This process began March
21, 1940 and was complete on May 6th.
The concrete roadway slab was chosen to counteract the
extreme lightness of the structure. Concreting began May 17th and was
complete June 10, 1940.
Slideshow
|
| [Show image] | Tacoma Narrows Bridge. East Tower Pier 5, looking
west, March 22, 1940. Simmer 682. PH Coll. 290.5 University of Washington
Libraries. Special Collections Division. |
| [Show image] | Tacoma Narrows Bridge nearing completion, May
6, 1940. James Bashford Press Photos. PH Coll. 290.9 University of Washington
Libraries. Special Collections Division. |
| [Show image] | Looking down at the pier through the unfinished
roadway of the Tacoma Narrows Bridge during construction, May 1940. Seattle
Post-Intelligencer Collection, PI-20788. Courtesy of the Museum of History
and Industry, Seattle. |
| [Show image] | View of the tower from the roadway during construction
of the Tacoma Narrows Bridge, May 1940. Seattle Post-Intelligencer Collection,
PI- 20787. Courtesy of the Museum of History and Industry, Seattle. |
[Enlarge image] Roadway of the Tacoma Narrows Bridge under
construction, May 1940. Seattle Post-Intelligencer Collection, PI-20789.
Courtesy of the Museum of History and Industry, Seattle. |
The bridge opened on July 1, 1940 to public acclaim. It had
been completed in record time and, with a 2,800 ft. central span, was
the third largest span in the world. The people of western Washington
celebrated the realization of their hopes when the Tacoma Narrows Bridge
opened to traffic.
|